Spectra-precision Survey Pro CE v3.6 User Manual Manual de usuario Pagina 68

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 407
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 67
Users Manual
62
c. The second Stake Points
screen will open
that displays all of the information
needed to locate the design point. When
connected to a total station, you would
turn the total station horizontally to
45°0000, vertically to 90°0000 and
send the rod man out about 70 feet before
continuing. Tap the button to
continue to the third screen.
d. With a
Height of rod
of
5
, tap the
button. (See the Reference Manual for an
explanation of the other fields.)
e. Enter the following shot data:
Angle Right
:
45
Zenith:
90
Slope Dist
:
70
and then tap to continue.
f. The Stake Points screen will show the
necessary
COME
/
GO
and
Go
RIGHT
/
Go
LEFT
information that the rod man
must move in order to be located over the design point. In
this example, the
Go
RIGHT
value indicates
0
, which means
the rod is precisely on the line between the total station and
the design point. The
BACK
value indicates
0.711
, which
indicates that the rod must move back (away from the total
station) 0.711 feet to be over the design point. The
Fill
value is
zero so no dirt needs to be cut or filled at the rod location to
match the design elevation.
g. Assuming the rod has been repositioned, take another shot by
tapping the button and enter the following new shot
data:
Angle Right
:
45
Zenith
Angle
:
90
Slope
Dist
:
70.8
and then tap to continue.
Vista de pagina 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 406 407

Comentarios a estos manuales

Sin comentarios