Spectra-precision Survey Pro CE v3.6 User Manual Manual de usuario Pagina 378

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 407
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 377
Roads Menu
R-221
Road Slope Staking
The Road Slope Staking screen is used to locate the catch point of the
road at any station.
: opens the Tap on a Road
screen
where you can tap on any road in the job to
select it.
Name
: displays the name of the selected road.
Begin
Station
: displays the station assigned to
the beginning of the road.
End
Station
: displays the final station in the
road.
: accesses the Backsight Setup
screen (Page R-72).
: takes you to the next Road Slope Staking
screen where the
slope staking parameters are set up.
Road Slope Staking Screen Two
The second Road Slope Staking screen is used to
set up some slope stake parameters prior to
slope staking the road.
Station
: is the station to be slope staked.
Station Interval
: specifies how far to advance
from the current station to the next station.
: advances the current station by
the
Station Interval
.
Vista de pagina 377
1 2 ... 373 374 375 376 377 378 379 380 381 382 383 ... 406 407

Comentarios a estos manuales

Sin comentarios