
Survey Pro Reference Manual
R-228
Road Slope Staking – Screen Two
The second Road Slope Staking screen is used to set up
some slope stake parameters prior to slope staking the
road.
Station
: is the station to be slope staked.
Station Interval
: specifies how far to advance from the
current station to the next station.
: advances the current station by the
Station Interval
.
Note: If the
Stake Corners
option is selected in the
Stakeout Settings screen, the button will
also stop at any horizontal or vertical alignment node,
and the beginning and end of any widening and super elevation that
falls within the interval.
: accesses the Backsight Setup
screen (Page R-78).
: returns to the previous screen.
H. Map Card
The H. Map card displays information about the horizontal details of
the road at the current station.
Segment Type
: displays the type of horizontal section at the current
station.
Left
/
Right
: is the description of the left and right templates that are
being used at the current station.
Comentarios a estos manuales