Spectra-precision Survey Pro v4.5 Ranger Reference Manual Manual de usuario Pagina 299

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 475
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 298
Stakeout Menu
R-291
Rod Elev: displays the elevation at the rod’s location computed from
the last shot.
Change… : is used to modify the current design elevation, which will
also modify the associated CUT/FILL value for the current station
being staked.
Shot : takes a shot to the prism and computes come/go, cut/fill
information.
Shot data: displays the measurements from the last shot.
Store… : opens the next screen.
Store/Tape… : opens the Stake Out Point (Tape Offset) dialog box
(Page R-309), where the staked point can be stored that includes a
specified offset. The default value is the appropriate distance
correction to the design point.
Topo SS… : stores a side shot using the data from the last shot
taken. (This will not take a new shot.)
Turn Gun : (available with robotic total station) turns the total
station toward the design point.
< Back : returns to the second screen.
Stake Next > : returns you to the second Stake Road screen, without
storing a stake point, where the Design point is advanced by the
Increment value.
Vista de pagina 298
1 2 ... 294 295 296 297 298 299 300 301 302 303 304 ... 474 475

Comentarios a estos manuales

Sin comentarios